Local delivery · Coatesville, Downingtown, Exton, Parkesburg
Women's Vintage Hooded Rain Jacket

MV Sport

Women's Vintage Hooded Rain Jacket

As low as $50.50/each

• 3.5 oz./yd², 100% polyurethane • Water-resistant fabric • Classic fit • Fully lined • Hood with matching drawcord • Cinching at back waist • Slit pockets • Elastic cuffs

Local Pickup
Shipping Nationwide
Rush available
Quality guaranteed
AudienceWomens

Our guarantee: we stand behind our print quality — a printing or adhesion defect, we’ll remake it or refund you. We print exactly what you approve, so please check spelling and artwork on your proof before you sign off.

Select Colors to Start Your Order

Start Designing(pick colors & sizes first)

Order it now, or get a hand-priced quote — either way you pick sizes and artwork when you're ready.

Product Information

Audience

  • Womens

Decoration Methods

  • DTF
  • Screen Print
  • Heat Transfer

Size Guide

SizeBody LengthChest Width (Laid Flat)Sleeve Length (From Center Back)
L36 1/223 1/233
M362232 1/2
S35 1/220 1/232
XL3725 33 1/2
2XL37 1/226 1/234
3XL382834 1/2

About the Women's Vintage Hooded Rain Jacket

• 3.5 oz./yd², 100% polyurethane • Water-resistant fabric • Classic fit • Fully lined • Hood with matching drawcord • Cinching at back waist • Slit pockets • Elastic cuffs

Decoration Methods We Offer

Choose the technique that fits your artwork — each links to its full method guide.

Frequently Asked Questions

What's the minimum order?+

We keep low minimums with no per-size minimum — mix sizes freely within a single order. Volume price breaks apply automatically as your quantity grows.

How long does production take?+

Standard turnaround is 5–7 business days after artwork approval. Rush options are available — just ask before you order.

What artwork files do you accept?+

Vector files (AI, EPS, SVG, PDF) are ideal; high-resolution PNG works well for DTF. Our team reviews every file before production.

Related

4.96★
80 verified reviews on Etsy

“To be successful, we must help others succeed.”

5–7 days
Typical production turnaround